domov

References

Water supply bridge in Črna vas

The bridge, featuring a weathering steel structure, spans approximately 60 meters and is distinguished by its aesthetic refinement and functionality. During fabrication and assembly, special emphasis was placed on the architectural harmonization of the corridors and the details of the wood fastening, which are crucial for a harmonious connection of materials and ensuring aesthetic consistency with the surroundings.

Due to the specific characteristics of the terrain, the assembly was demanding, as it was first necessary to reinforce the ground for safe and precise execution. The bridge assembly was carried out with multiple cranes positioned on both banks, which enabled precise placement of the structural elements and ensured a high level of safety during execution.

Flexible
projects

Turnkey
solution

Up-to-date
team

30+ years
of experience

Family
business

25
zaposlenih