{"id":4066,"date":"2026-06-17T16:14:27","date_gmt":"2026-06-17T15:14:27","guid":{"rendered":"https:\/\/metalia.si\/?post_type=referenca&#038;p=4066"},"modified":"2026-06-17T16:14:27","modified_gmt":"2026-06-17T15:14:27","slug":"overpass-above-the-northern-ljubljana-ring-road","status":"publish","type":"referenca","link":"https:\/\/metalia.si\/en\/referenca\/overpass-above-the-northern-ljubljana-ring-road\/","title":{"rendered":"Overpass Above the Northern Ljubljana Ring Road"},"excerpt":{"rendered":"References We manufactured and installed a 42-metre-long steel pedestrian overpass above the northern Ljubljana Ring Road, with a total weight of 45 tonnes. The project included the fabrication of three steel segments, which were transported to the Barje rest area and welded into a single structure. The assembled overpass was then transported in one piece&#8230; <a class=\"view-article\" href=\"https:\/\/metalia.si\/en\/referenca\/overpass-above-the-northern-ljubljana-ring-road\/\">View Article<\/a>","protected":false},"featured_media":4065,"template":"","meta":{"_acf_changed":false},"class_list":["post-4066","referenca","type-referenca","status-publish","has-post-thumbnail","hentry"],"acf":[],"_links":{"self":[{"href":"https:\/\/metalia.si\/en\/wp-json\/wp\/v2\/referenca\/4066","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/metalia.si\/en\/wp-json\/wp\/v2\/referenca"}],"about":[{"href":"https:\/\/metalia.si\/en\/wp-json\/wp\/v2\/types\/referenca"}],"version-history":[{"count":1,"href":"https:\/\/metalia.si\/en\/wp-json\/wp\/v2\/referenca\/4066\/revisions"}],"predecessor-version":[{"id":4067,"href":"https:\/\/metalia.si\/en\/wp-json\/wp\/v2\/referenca\/4066\/revisions\/4067"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/metalia.si\/en\/wp-json\/wp\/v2\/media\/4065"}],"wp:attachment":[{"href":"https:\/\/metalia.si\/en\/wp-json\/wp\/v2\/media?parent=4066"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}